Montana Department of Transportation Bridge Underwater Inspections
- Date: 2018-Present
- Project Type: Underwater Bridge Inspection
Montana Department of Transportation Bridge Underwater Inspections
- Date: 2018-Present
- Project Type: Underwater Bridge Inspection
Key Project Details
- Underwater inspections of 52 bridges that included scour assessment in accordance with HEC 18
- Total Trimble Station identified 10 structures that had scour related deficiencies
- NDT techniques were utilized, which included both timber resistance testing and ultrasonic thickness measurements
- MicroStation was used to create profile drawings and channel contours
Key Project Details
- Underwater inspections of 52 bridges that included scour assessment in accordance with HEC 18
- Total Trimble Station identified 10 structures that had scour related deficiencies
- NDT techniques were utilized, which included both timber resistance testing and ultrasonic thickness measurements
- MicroStation was used to create profile drawings and channel contours
Similar Projects
Colorado Department of Transportation Statewide Underwater Inspection of On-System & Off-System Bridges
Divided into 3 task orders: On-System, Off-System, and Blue Mesa
Reservoir bridges.
Wyoming Department of Transportation On-System & Off-System Underwater Bridge Inspections
eO performed 49% of the level I and II underwater inspections.
North Dakota Department of Transportation Underwater Bridge Inspections
Substructures were composed of a variety of concrete, steel, and timber elements.