Arkansas Department of Transportation Statewide Underwater Bridge Inspection
- Date: 2021-Present
- Project Type: Underwater Bridge Inspection
Arkansas Department of Transportation Statewide Underwater Bridge Inspection
- Date: 2021-Present
- Project Type: Underwater Bridge Inspection
Key Project Details
- Included bridges over several of the major river crossings, deep water reservoirs, and structures over many of the minor waterways
- Deep water hyperbaric chamber diving operations were performed for one of the structures, which included several piers exceeding 120 feet in depth
- Channel contours and profiles were created utilizing MicroStation, which were used to monitor channel scour and streambed migration
- eO received an additional 101 underwater bridge inspections after our first two task orders; these additional structures included three crossings of the Mississippi River
![Photo 1](https://engineeringoperationsco.com/wp-content/uploads/2023/10/Photo-1-19.jpg)
![Anafi 1.8.2](https://engineeringoperationsco.com/wp-content/uploads/2023/10/Photo-2-18.jpg)
![Photo 3](https://engineeringoperationsco.com/wp-content/uploads/2023/10/Photo-3-17.jpg)
![Anafi 1.8.2](https://engineeringoperationsco.com/wp-content/uploads/2023/10/Photo-4-15.jpg)
![Photo 1](https://engineeringoperationsco.com/wp-content/uploads/2023/10/Photo-1-19.jpg)
Key Project Details
- Included bridges over several of the major river crossings, deep water reservoirs, and structures over many of the minor waterways
- Deep water hyperbaric chamber diving operations were performed for one of the structures, which included several piers exceeding 120 feet in depth
- Channel contours and profiles were created utilizing MicroStation, which were used to monitor channel scour and streambed migration
- eO received an additional 101 underwater bridge inspections after our first two task orders; these additional structures included three crossings of the Mississippi River
![Anafi 1.8.2](https://engineeringoperationsco.com/wp-content/uploads/2023/10/Photo-2-18.jpg)
Similar Projects
South Carolina Department of Transportation Statewide Bridge Inspections- District Six
eO performed topside and underwater inspections that required SCUBA and SSA gear throughout South Carolina’s Charleston District (6).
Florida Department of Transportation - Florida’s Turnpike North Bridge, Sign, LNQC, and HMLT Inspections
Inspections include both routine and underwater throughout FL Turnpike’s North Corridor.
Mississippi Department of Transportation IDIQ Master (On-Call) Contract for Underwater Bridge Inspection Services
eO completed the underwater inspection of 35 bridges and box culverts in Districts 01, 03, and 05.
Similar Projects
![Anafi 1.8.2](https://engineeringoperationsco.com/wp-content/uploads/2023/10/Title-Photo-770x578-13.jpg)
South Carolina Department of Transportation Statewide Bridge Inspections- District Six
eO performed topside and underwater inspections that required SCUBA and SSA gear throughout South Carolina’s Charleston District (6).
![Title Photo (770x578)](https://engineeringoperationsco.com/wp-content/uploads/2023/10/Title-Photo-770x578-12.jpg)
Florida Department of Transportation - Florida’s Turnpike North Bridge, Sign, LNQC, and HMLT Inspections
Inspections include both routine and underwater throughout FL Turnpike’s North Corridor.
![Anafi 1.8.2](https://engineeringoperationsco.com/wp-content/uploads/2023/10/Title-Photo770x578-7.jpg)
Mississippi Department of Transportation IDIQ Master (On-Call) Contract for Underwater Bridge Inspection Services
eO completed the underwater inspection of 35 bridges and box culverts in Districts 01, 03, and 05.