Arkansas Department of Transportation Statewide Underwater Bridge Inspection
- Date: 2021-Present
- Project Type: Underwater Bridge Inspection
Arkansas Department of Transportation Statewide Underwater Bridge Inspection
- Date: 2021-Present
- Project Type: Underwater Bridge Inspection
Key Project Details
- Included bridges over several of the major river crossings, deep water reservoirs, and structures over many of the minor waterways
- Deep water hyperbaric chamber diving operations were performed for one of the structures, which included several piers exceeding 120 feet in depth
- Channel contours and profiles were created utilizing MicroStation, which were used to monitor channel scour and streambed migration
- eO received an additional 101 underwater bridge inspections after our first two task orders; these additional structures included three crossings of the Mississippi River





Key Project Details
- Included bridges over several of the major river crossings, deep water reservoirs, and structures over many of the minor waterways
- Deep water hyperbaric chamber diving operations were performed for one of the structures, which included several piers exceeding 120 feet in depth
- Channel contours and profiles were created utilizing MicroStation, which were used to monitor channel scour and streambed migration
- eO received an additional 101 underwater bridge inspections after our first two task orders; these additional structures included three crossings of the Mississippi River

Similar Projects
South Carolina Department of Transportation Statewide Bridge Inspections- District Six
eO performed topside and underwater inspections that required SCUBA and SSA gear throughout South Carolina’s Charleston District (6).
Florida Department of Transportation - Florida’s Turnpike North Bridge, Sign, LNQC, and HMLT Inspections
Inspections include both routine and underwater throughout FL Turnpike’s North Corridor.
Mississippi Department of Transportation IDIQ Master (On-Call) Contract for Underwater Bridge Inspection Services
eO completed the underwater inspection of 35 bridges and box culverts in Districts 01, 03, and 05.
Similar Projects

South Carolina Department of Transportation Statewide Bridge Inspections- District Six
eO performed topside and underwater inspections that required SCUBA and SSA gear throughout South Carolina’s Charleston District (6).

Florida Department of Transportation - Florida’s Turnpike North Bridge, Sign, LNQC, and HMLT Inspections
Inspections include both routine and underwater throughout FL Turnpike’s North Corridor.

Mississippi Department of Transportation IDIQ Master (On-Call) Contract for Underwater Bridge Inspection Services
eO completed the underwater inspection of 35 bridges and box culverts in Districts 01, 03, and 05.